We are looking to finish our basement. Our home is in Westmount, built in 2015, two storey 2270sq ft, and the mechanical room is already framed in at 100 sq ft. The exterior walls in basement are already insulated and have vapor barrier. Here is what we are looking for:
- One bedroom with closet
- One bathroom with walk in tiled shower, single vanity, toilet, small linen closet, tile floor
- One small counter with single sink and mini fridge as wet bar (4ft)
- Open concept living area with carpet
- Potlights throughout except in bedroom with fixture
- Possible gas fireplace off mechanical room
- TV setup
- We would like it matched to the rest of the home as much as possible. We have all samples so that should help.
Looking to have our 1200sqft basement developed. This will consist of 2 bedrooms, 1 bathroom, rec room and a utility/storage room. HVAC and plumbing rough ins have already been completed. The outer walls have been studded (steel) and insulated by the builder (Pacesetter). Finishes are to match the main levels, 6" base boards/casings, arch top doors etc. The house will be 5 years old this year and has no existing foundation or moisture issues.
Thank you in advance for your time and consideration.
Basement development.
Some framing and insulation. Drywall- tape, sand, mud, etc. Paint- prime, texture, etc. Flooring- vinyl plank, carpet for stairs. Swing doors and pocket door. Kitchen- cabinets, drawers, etc. Casings, baseboards etc.
Approximately 900 square feet. Legal suite
I have purchased a 1977 hm which needs a little work. The utility room is a dungeon of furnace and laundry machines, on concrete, small, with an unused, small unfinished room directly beside it. I would like to create a larger laundry area, clean with proper drainage, shelfing and storage, properly finished with a correct door access to the greater area of the basement. There are 2 bedrooms that can be left as is for now, but the rest needs ceiling insulation for noise, plumbing pipes to be checked as hot water pipes "jump when turned on in kitchen above", new carpet and pot lighting, the list goes on to make it an inviting, warm environment to exercise in, watch tv and have the grandkids play comfortably.
Thanks for your help,
Frieda
We are looking for a quote for our basement.
We have about a 650 sq foot basement that is unfinished and the home was built in 2007. We are looking to make in into 2 rooms, 1 a play room/bedrom and the other a tv room. The basement also has the plubming all ready roughed in so we want to put in a 3 piece bathroom with a pedstal sink, toilet and a stand up shower. and are looking to put carpet through out th basement, and possibly drop ceilings.
Please provide a quote to the email address. Thank you and look forward to seeing some quotes to arrive soon.
Thanks again,
Brenda
We are looking at getting our basement finished. The home was built in 2005 and is a walk-out. Approximate basement square footage is 800 sqft. with a good portion of that being the furnace/water heater area. Minimal partitioning required. 4 piece bathroom is rough plumbed as well as drainage provided for a wet bar. Basically would want the bathroom partitioned as well as the "furnace room" with the remaining to be left open. Looking at gyproc walls and ceilings (maybe drop tile, depending on quote) as well as some lino at the patio door entry and bathroom....carpet throughout the remainder. Would also need the stairs finished with lino. Thank you.
I have framed the basement, done the insulation and poly, The plumbing has been inspected, Electrical rough in inspection complete. I require the drywall to be installed and painted, I have already bought the drywall, screws, mud, tape, corners. I need the basement completed. The bathroom has had the drywall completed but I need the mudding and finishing of it. Vanity installed shower, toilet. All of which I have already purchased.
I need to finish my basement. The plumbing rough in is done for the bathroom I need a a bedroom with a closet. required window size already there. Its a new construction. It is a full basement for a 1350 square foot home. I need at least a 3 piece bath. I also need a living area with the one side roughed in for a future small kitchen. I need flooring done.The basement need to be completed in the most professional way and economical with a budget max of $15000. project to start about mid Aug to early September depending on permit approval.
Thanks
1900 square foot bungalow with unfinished basement. Looking to finish it with 2 large bedrooms with jack and jill bathroom splitting the rooms, laundry room, half bath, wet bar, open living room and games room area, large storage area. Would like floors in bathroom to be heated, subfloor in basement with carpet and tile, insulated ceiling, pot lights and potential steel or laminated beam to eliminate teleposts.
Basement has dry wall up, electrical finished, bathroom has tub and all plumbing finished
Need drywall/finish ceilings
Finish bathroom tiling and install finishing
Want to finish floors with coloured epoxy and/or flooring not requiring sub floor.
Base boards
Prefer non smoking individuals please
Approximately 600 to 700 sqft basement, one bathroom, two walls, one double door, one single door, carpet, small kitchen (4 feet long) with one sink. Roughed in ventilation, toilet drain, bath/shower drain for bathroom. 5 lights, drywall ceiling coated with textured paint. Sound insulation on ceiling. Stairwells included.
I have purchased a 1990 home. The basement is 1400 sqft with some electrical and bathroom plumbing roughed in. I am looking to put in a bedroom, bathroom (3 piece), exercise room and storage room. In the main living area I would like a small wet bar. Fairly simple finishings, carpet on the floor (except tile in the bathroom and rubber matting in the exercise room). The current electrical box is full, so the project would require a new subpanel.
Small duplex condo basement:
Approximately 300 sq. ft. finished with laminate flooring. Ceiling to be drywall finished not (drop ceiling panels). The basement is already insulated. There have never been leaks or any water issues. We would like a utility sink installed in the area where the washer/dryer and furnace are located. Stairs going up will need to be finished with either laminate or carpet.
I need a basement framed in a small town house. It will have an open area and a bathroom there is a wall that goes up the stairs but is mostly square and I would like it open under the stairs. 2 30"door openings .and some bulk heads to build. Total area is a 17ft x 17ft . 2x4 walls and 2 x 6 on a short wall to accomodate some plumbing.It is approx 30 yrs. It is not finished now.
We have an 1100+ basement (home is 5 yrs old) that needs finishing. I am looking at a laundry room, bedroom, furnace room, 3 piece bath (no tub just shower) and family room with possible wet bar. Some framing has been done but the majority is still needed. Drywall, mudding and finishing the walls are needed. I want a drywalled ceiling ... NO PANELS or TILES! Laminate flooring through-out with the exception of the washroom, that will be tiled and the furnace room, concrete will not be covered.
I do intend to apply for the tax credit so only qualified contractors apply...PLEASE.
Hi. I am hoping to get a quote to finish the basement in a 2500 sq ft 2 story home. Would want one bedroom, one bathroom, and one rec room. Also likely would want sliding doors along most of one wall in order to put storage behind but open to other ideas. If possible it would be great if we could do on a weekend. Let me know if you can assist.
Thanks.
I need a contractor to give me a estimate to finish incomplete work in the basement (baseboards, door casings and window casings and wear and tear on my pond after the winter months (obviously the pond cannot be worked on as winter season is coming up and is not feasible to start work on right now.
We recently had our basement 'gutted' to install interior weeping tile and seal. THe basement in now open. No sub floor. There is a 4x6 retaining wall on the south side where there were minor cracks showing in the foundation. This wall needs insultation/vapour barrier. The other three sides require frost walls.
We would like to consider a Superseal All-in-one type subfloor to maximize head room and insulate the floor.
The ceiling is partly finished and partly open.
We are looking for:
Replacement of two standard basement windows. (30 x 11.5)
Installation of one new egress window (will require cutting into the concrete foundation, excavating exterior and installing a window well)
Roughed in plumbing/wiring for future installation of a bathroom.
Drywall/plaster/paint for walls and ceiling
All-in-one subfloor
The basement measures 22 x 28 X 7 feet. There are four 1'sq supporting posts along the central support beam.
Thank you
Anne
We are looking to put a bathroom, kitchen and TV room in the undeveloped half of our basement. Area where these rooms are to be situated measures approx 39 ' X 11' and is completely undeveloped with the except ion of a wall and doorway at approx 19' mark. We require framing of the outside walls in this area ( 39' and 2 X 11') as well as the framing of a bathroom between the TV room and Kitchen room. Plumbing has been roughed in in the area of where the bathroom will be.
We are looking for an estimate for how much the framing will be.
My house is 3 years old. I"m developing the basement. The exterior walls are framed but I need some interior installation done. Specifically 3 walls and a door for the bathroom and a wall and door for the furnace/hot water area. I'm also looking to have someone do the plumbing and installation of the bathtub sink and toilet. I think that's about it.