Ever wonder what you're neighbours are doing to improve their homes? Discover what other Port Moody homeowners have planned for their Tiling projects by reading the details of their request for quotes below.
In total, TrustedPros has received 10 Tiling projects posted by homeowners in Port Moody seeking the services of local Tiling Contractors. Total estimated value of these projects is $33,500.00 with a per project average of $3,350.00.
If you're in need of a contractor for your Tiling project, use our job posting tool to get matched to local pros or browse our directory of Read Reviews of Port Moody Tiling Contractors.
City | #Projects | Total Value | Avg Budget |
Vancouver | 140 | $542,500.00 | $3,875.00 |
Surrey | 99 | $295,000.00 | $2,979.00 |
North Vancouver | 45 | $248,000.00 | $5,511.00 |
Burnaby | 45 | $199,000.00 | $4,422.00 |
Langley | 37 | $204,000.00 | $5,513.00 |
New Westminster | 26 | $125,500.00 | $4,826.00 |
Coquitlam | 42 | $155,000.00 | $3,690.00 |
Maple Ridge | 26 | $100,500.00 | $3,865.00 |
Richmond | 19 | $76,000.00 | $4,000.00 |
Delta | 18 | $80,500.00 | $4,472.00 |
Port Coquitlam | 15 | $59,000.00 | $3,933.00 |
Port Moody | 10 | $33,500.00 | $3,350.00 |
45sq ft area in kitchen needs thinset removal. The sub floor is concrete, there is an underlay adhesive that needs to be removed also. As dust free as possible.
The tile being layed down is 6x24 porcelain tile. Then grout needs to be layed as well.
Only the 45sq ft area needs to be tiled but the entire area to be grouted is 300sq ft.
Already have the new thinset, the tile and the grout.
I am doing a kitchen backsplash with a roman pattern travertine tile...about 34 ft2. The dims are below for segment of the backsplash
75" L x 18" H schluter edge and one outlet cut
107" L x 18' H and three outlets
17" x 19" schluter edge one double outlet
91" L x 6" H schluter edge one outlet
I live in a highrise in Port Moody Newport Village
I have chosen the tile and can have it in a week depending on availability of installer.
Thanks
Gary
would like to have the following done, but do appreciate that may not be possible using one single contractor and as such willing to phase the work over a longer period of time rather than all at the same time:
1. change tile floor in kitchen, powder room, front lobby and laundry room to match
2. change/update 2 fireplace surrounds to more modern
3. change paint of some (not all) of the walls
4. refinish/polish-paint, as needed, kitchen cabinets
5. re-configure built-in TV cabinet to accommodate new, larger TV
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.
Click here to get started