Ever wonder what you're neighbours are doing to improve their homes? Discover what other Richmond homeowners have planned for their Electrical projects by reading the details of their request for quotes below.
In total, TrustedPros has received 14 Electrical projects posted by homeowners in Richmond seeking the services of local Electricians. Total estimated value of these projects is $29,100.00 with a per project average of $2,078.00.
If you're in need of a contractor for your Electrical project, use our job posting tool to get matched to local pros or browse our directory of Read Reviews of Richmond Electricians.
City | #Projects | Total Value | Avg Budget |
Vancouver | 101 | $684,500.00 | $6,777.00 |
Surrey | 88 | $809,500.00 | $9,198.00 |
New Westminster | 24 | $90,500.00 | $3,770.00 |
North Vancouver | 40 | $245,500.00 | $6,137.00 |
Coquitlam | 26 | $149,000.00 | $5,730.00 |
Burnaby | 22 | $104,500.00 | $4,750.00 |
Delta | 15 | $30,000.00 | $2,000.00 |
Port Coquitlam | 28 | $79,000.00 | $2,821.00 |
West Vancouver | 8 | $27,500.00 | $3,437.00 |
Richmond | 14 | $29,100.00 | $2,078.00 |
Job scope:
1. Replace an existing single gang electric outlet box as one of the screw holes is broken.
2. Verify a non working receptacal, if it can not be fixed, then add an new receptacle outlet in the garage. There is an single pole switch for a light (verified with ground wire) on the back side of the wall. Should be able to get power from it instead of running a new wire.
1st image is where the non working outlet is, and on the back side of this wall, there's a single pole switch in the 2nd image with ground wire.
We have a large warehouse that is being subdivided for 2 uses and we would like to break split the lighting up into zones. We require the following work be done by January 1.
North Area:
Install light switch at entrance on NE corner to control lights North of sprinkler room (approx. 60 fluorescent). Install lighting contactor above electrical panel. Change lighting to have 1 24hr night light near entrance door.
South Area:
Separate out 4 fixtures in each row (13 rows) to allow control from a new light switch at entrance on SE corner of building. Change lighting to have 1 24hr night light near entry door.
Add wiring to allow all lights in south bays to be controlled at NE entrance (3-way switch)
Priority is on the south area- this needs to be done by Jan 1.
We have a dedicated scissor lift available on site as of Monday Dec 30. We have a floor plan, and schematic of what needs to be done that can be provided to anyone interested who can be available to start Dec 30. Sorry for the short notice- the contractor we had lined up is delayed at another project!
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.