Cost for ensuite remodel for master bedroom in Acton

Question Icon
Posted by: from Acton
10/30/2017 at 11:23:39 AM

We just bought the home and the ensuite is to cramped. There is a jacuzzi tub at the end of the room. there is a small shower on the left of the counter and the counter is small because of the shower. we would like to remove the jacuzzi tub and pot a nice glass faced shower in it's place. we would like to remove the small shower and extend the counter. The door is small because of the shower location, so we would like to install a bigger door. How much would a job like this cost and how long would it take?

Cost for ensuite remodel for master bedroom in Acton
Cost for ensuite remodel for master bedroom in Acton
REPLIES (8)
User Icon
Ryan from Clean Habits in Mississauga
Date/Time10/30/2017 at 12:17:35 PM

Hi Max,

My name is Ryan Carwardine I'm the CEO of Clean habits.

So it would take about 4-6 days to rip everything out and then from there about another week so in total your looking at about two weeks as long as no other issues arise.

Thank you Max

Ryan Carwardine

CEO

Clean habits

User Icon
Date/Time10/30/2017 at 12:19:59 PM

You're looking at $8000-$10000 in labor 10-12 days for everything.

User Icon
Date/Time10/30/2017 at 1:25:49 PM

To remodel the bathroom as you described, I would say around $9,000 for labour and around $4,000-5,000 for building materials, tile and fixtures (using better than average materials).

If you want frameless glass wall and door, you can expect another $2,000.

Time wise , I would budget 3 weeks.

User Icon
Date/Time10/30/2017 at 3:15:17 PM

That would be in the range of $15000

User Icon
Date/Time10/30/2017 at 6:40:00 PM

Hi, this is Jim from JII FINE HOMES,

Timing you are looking about 7 working days.,

And in terms of cost you are looking $ 10,000 labour and roughly $4000 material.

All really depends on what kind of material you use and your finishes.

Thanks

Jim

User Icon
Vincent from James Renovations in Scarborough
Date/Time10/30/2017 at 6:46:13 PM

Hi,

We specialize in complete bathroom remodeling. The project with your description will take an estimated 2 weeks. Estimated cost of labor alone will be around 10,000.00 Material cost can vary between 4,000.00 to 6,000.00 depending on the material used.

Thanks

Vincent James

JAMES RENOVATIONS

User Icon
Date/Time11/8/2017 at 6:44:08 PM

Hi, it is hard to nail this down based on what you describe but I would budget between 9-$11 000 for labour and about $4000 for materials. If you want to go with a schluter - wedi membrane (recommended because this is a 2nd floor bathroom), they are expensive but guarantees you wont have leakage in the future, as long as it is installord correctly.

User Icon
Date/Time11/8/2017 at 6:44:08 PM

Hi, it is hard to nail this down based on what you describe but I would budget between 9-$11 000 for labour and about $4000 for materials. If you want to go with a schluter - wedi membrane (recommended because this is a 2nd floor bathroom), they are expensive but guarantees you wont have leakage in the future, as long as it is installord correctly.

Search the TrustedPros directory and discover the best contractors in your area.

Find your home service pro
Great renovations start with a great contractor.

Since 2004, TrustedPros has been helping homeowners find the right contractor for their home improvements and repairs.

Post Your Project

Within hours you'll be comparing offers from top-rated professionals. It's free to post and you're under no obligation to hire.

 
Trustedpros Inc. does not warrant the accuracy, completeness, safety, legality or usefulness of any Content, or Whether Content is Current and up-to-date, and TrustedPros Inc. Shall have no liability whatsoever with respect to your use or reliance upon any content or for content being removed or otherwise ceasing to be available. Please refer to the terms and conditions of use of this websites for more details.
Categories

Get quotes from top-rated contractors

x