I would like to know an estimated cost of adding a 3 piece bathroom which would require a dormer window in a 1.5 store house. Upstairs has 2 bedroom and bathroom with go in between. Dormer is at front of the house and all plumbing goes to side of house for existing sinks/toilets on main floor.
It's hard to say.... If there is no plumbing in the area already and I'm only adding a window you can rough estimate 15 thousand with all materials supplied by me (provided that you approve of them ) permits pulled for electrical and plumbing and turn key finish. This includes vanity, phoset , trim carpentry, paint... total 100% finished custom bathroom...but I would have to see it to give a detailed quote.
With plans and Permit.
Your looking anywhere from 15,000 to 25000.
If you are going to add a dormer for a bathroom, I recommend building a cabin dormer across the full front.
looking at the pic I can assume the BR. are rectangular with limited head room, a full dormer give you more bang for your buck.
18,000- 28,000 cost lay out
10,000- 20,000 rise in equity
Depending on materials you are choosing - standard materials and labour 10-14 days of Reno with a cost of between 28-30k.
Search the TrustedPros directory and discover the best contractors in your area.
Find your home service pro