Hi,
How much would it cost me to:
Flooring
Remove exiting flooring to original plywood subfloor (approximately 365SF)
Remove existing quarter round to be replaced with new shoe mounding after new engineered flooring installation.
Remove ceramic flooring in front foyer area (approximately 12SF)
Remove all construction waste from site
Supply and install the following:
Felt underlayment to all areas where engineered flooring is to be installed
Install allure isocore flooring
Supply and install new paint grade shoe moulding to all areas where new flooring has been installed
Remove all new flooring waste material from site
Hi Aileen,
You have your specs pretty well figured out so all you need to do is to have some contractors have a look so they can give you accurate numbers. This is a great site and you can put this spec in the "post your project" area so some local guys can come and have a look.
Good luck with it.
Jim Kuzma
Cole Harbour Handyman
Search the TrustedPros directory and discover the best contractors in your area.
Find your home service pro