I need parging repairs and my driveway replaced. The driveway is right next to the side of the house where I need the parging repaired. I've been told that my driveway should include a slope away from the house for water run off. I'm not sure which to do first, but I think the parging repairs.
Thanks in advance for your ideas!
Same time.
Excavate the driveway first and after excavation complete the parging repair. Once the parging has set you are good to go with the rest of the project.
Have the drive way remove first then repair the parging when parging is dry you can go ahead with the driveway. and yes should be slopped away from the foundation.
Search the TrustedPros directory and discover the best contractors in your area.
Find your home service pro