We have a leak behind/beside/above our shower wall - noticed by peeling paint/bubbles. We suspect you will need to cut into drywall and/or tile to repair the leak. Looking for a contractor to be able to repair both the plumbing leak and any cuts to the drywall/tile. We only have the 1 shower in our home, and do not want the leak to get worse, so we need the work done soon and fairly quickly.
New bathtub, soaker, new tiles on walls and ceiling of bathtub, My fixtures are moen. New counter top but not vanity. I am putting in a new toilet. floor will remain the same. (white tile with grey in it). window is new.
Bathroom is small. walk in thru door, first is the vanity then tub. toilet is under window across from door. the other side has a bifold door behind the entry door. that has the washer and dryer (stacked) I have no shelving other than vanity.
6 year old house, seems like it needs grouthing in the standup shower, because we see a brown streak on the ceiling below the bathroom... not sure if its just shower fixing or the pipe line leakage...
Aslo have other issues around the rest of the house, like kitchen fixture leakage...
We would like an onsite visit by a professional to take a look at this major issue and other fixing items around the house...
Thank you
Bathroom Reno
We are looking to re-do our main bathroom, we are looking for a labour quote on:
* Removal of bathtub, backsplash
* new tub installed (Soaker Tub) & bath faucet
* New tile on backsplash and floor (with cement board/hardboard) & 2 sqft niche
We are in Barrie, and can start the job asap.
Hello.
Homeowner looking for an ensuite bathroom reno. The plan includes glass-block inserts through two outside walls, and a partial curved wall framing a walk-in double head shower space. Skills: "Watertight Shower Construction," plumbing, tiling, basic electrical and some carpentry (cutting through exterior walls - 1 vinyl, 1 brick - to install glass block).
If this is something you would be interested in, I look forward to your visit and quote.
Thank you.
-e
We are looking to re-do our main bathroom, we are looking for a labour quote on:
* Removal of bathtub, backsplash and bulkhead
* new tub installed (Soaker Tub)
* New tile on backsplash and floor
If we wanted to buy a soaker tub with jets how much would this increase the job?
We are in Barrie's south end, and can start the job asap.
Again 1920's house with basically 1960's last reno. Complete demolition of existing walls, ceiling etc. Probable subfloor damage. Completion time of project important as essentially this is the only bathroom in the house! New sink, tub and toilet required. Ideally the same company willing to do both the kitchen and bath renovations :)
Twenty year old house with original bathrooms grout coming out. Bathtub and tiles have lost their luster. Job must be one bathroom at a time.
Required Work
Ensuite Bathroom:
Remove tub and tiles
Supply and install 3 piece acrylic tub / shower (for example Maax Advanta Aspen 3 piece, left drain, in bone. There must be a mortar base, covered with 2 mil polyethylene sheet for strength and support. Note that the drywall header will need to be altered if this model installed.
Supply and install new suitable chrome fixtures.
Supply and install 3 panel doors in shower / tub (for example Maax Triple Plus 3 Panel door in chrome)
Install ceramic vanity sink (home owner will supply sink).
Supply and install new suitable chrome fixtures.
Remove vinyl flooring.
Supply and install 12" X 12" ceramic floor tiles.
All removed material and cleanup will be the vendor's responsibility.
Main Bathroom:
Remove tub and tiles
Supply and install 3 piece acrylic tub / shower (for example Maax Advanta Aspen 3 piece, left drain, in bone. There must be a mortar base, covered with 2 mil polyethylene sheet for strength and support. Note that the drywall header will need to be altered if this model installed.
Supply and install new suitable chrome fixtures.
Supply and install 3 panel doors in shower / tub (for example Maax Triple Plus 3 Panel door in chrome)
Install ceramic vanity sink (home owner will supply sink).
Supply and install new suitable chrome fixtures.
All removed material and cleanup will be the vendor's responsibility.
I am looking to redo my bathroom. It is currently with no drywall just insulated with the rough fittings in place by the plumber and electrical complete for vanity light and outlet. I have purchased the Schluter system to build the shower. Looking for someone to tile the shower and flooring. The bathroom is 90x72. Also have uberboard as the “drywall” to be used for the walk in shower which I have been told can be tiled right on top of.
Only contractors who meet these requirements need apply:
- fully insured/bonded (e.g. property damage, etc.)
- workers' comp. covered
- non-smoking & workplace cleanliness
- have references and many years of experience
Bathroom #1:
- strip paint
- sand & smooth; mud as needed due to some peeling of drywall
- paint
- add crown molding and new light fixture
Bathroom #2
- replace bathroom sink unit (plumbing may be required - require licensed person to do this)
- molding around shower which is incomplete (tile edges from shower still show)
- seal shower and tub grout
- sand and beautify door frame
-paint
Other:
- beautify 2 door frames
- use nail gun to attach last of baseboards (15 ft)
- add weatherstripping/other to door at the base to prevent bug entry
Pls. provide in your quote:
- at least 2 references for jobs completed within the past 3 months
- your related experience (website) and why we should hire you
- when you can start
- how long you project the work will take
- quote per bathroom
I am property owner.
1. Replace tub and tile in main floor bath. Have new bathtub already
2. Install tiled shower and shelving in ensuite. Old bath tub already removed.
3. Replace shower only in basement 3 piece.
4. Replace old deckboards and railing on deck (approx 925 sq ft, 105 ln ft vinyl railing).
5. Landscape Quotes for replacing current interlock and pressure treat 8" x 8" wall and multi level stairs. Retaining wall is 75' w x 3' h across full property width; approx 50' stepped down west side of yard to back retaining wall. Considering armour stone or other large stone block.
Taking down and retiling walls, floor, installing new standard tub, keeping existing toilet, installing new vanity and tap set, towel bar etc. I would like to book it early May and if possible have entire project done in one week as it's the only bathroom on main floor, and upstairs is tenanted. Also, I am stlightly hearing impaired so either e-mail or text is easiest way to communicate. This project is budget conscious not high end and is focussed on assisting upcoming resale of the home.
We are looking to have a master bathroom renovation done. Opening up wall between closet and bathroom to have a walkway. Moving vanity to opposite wall and changing to two sinks. Moving electrical and plumbing. Building tiled shower space. Most of the demolition has been done. We are located in Horseshoe Valley.
Complete bathroom overhaul. Expanding the bathroom by 12" (knocking out a wall to bedroom next to it) moving the door to bathroom down. Complete gutting of the bathroom down to the studs. Moving toilet, sink, shower to different areas of the bathroom (plumbing needed) and some electrical needed as well. Drywall will need to be replaced, tile shower area and floors, paint the walls etc, etc. Prefer this job be done by one person or a team. Put bathroom back together, install new sink, shower and toilet, pot lights a couple of outlets, barn door. We've gotten 2 quotes so far. 1 guy I found on kijiji and he seems super low, but didn't come with any paper to write anything down, didn't bring his own tape measure and seems too low to be true. The other is wayyyyyyyyy too expensive, so thought i'd give this a shot.
Thank you.
Small bathroom (5 feet by 7 feet) partially demolished still needs tub, toilet and fixtures removed plus about 50 square feet of drywall removed or glue residue from where tile was removed if drywall salvageable. Need a fan/vent installed and an electrical outlet installed as currently the only outlet is in the light. Will need new soaker tub installed along with tiling and grab bar plus faucets and shower head. Need 24 inch vanity installed and a mirror, new lights plus toilet installed. Towel bars and toilet paper holder as well. New flooring to be installed - about 25 square feet. Start time is flexible but I would like it completed no later than beginning of March.We already have the toilet and tiles and I would like to select and purchase my own tub and vanity, light, towel bars, faucets.
Bathroom reno needed on a 11 year old house. Plumbing is leaking and there is water damage on ceiling below. We haven't use the tub/shower in two years. We would like to gut the bathroom and redo. We have purchased a shower door&base from Costco and porcelain tiles for the shower. We do not want a tub. We need someone to fix the plumbing, properly waterproof the shower, install the shower doors and base, install the tiles and plumbing fixtures. We will be purchasing a new vanity and faucet and new toilet and tiles for the floor that will need to be installed too.
I currently have a small three piece bathroom in my basement. I would like to expand the size of the room by taking over existing closet space and/or corridor space and put in a larger shower and a countertop. The shower drain and toilet may have to be moved depending upon new layout.
Please note, contractor must have experience working with a septic system
Need someone to put in a bathroom 3piece ( shower, sink and toilet ) from scratch (rough-in pipes only) in basement . With ceramic tiles floor and in the shower walls. New subdivision house.***Also need DECK Pressure Treated wood , size approx. 12x12 and 6x12 section joined as one( there will be 2 patio doors) with rail and one set of stairs ( maybe 3 steps) see attachment.
Re-tile bathroom floor over existing tiled floor. Floor size 5 ft x 5 ft
Tear down tub surround and put new tile from bathtub edging to ceiling appx 6 feet high on the 3 walls surrounding the bathtub.
Replace toilet
Replace bathroom sink
Tile one bathroom wall 5 feet x 4 feet high.
Consumer will supply the new tiles, new sink pedestal and toilet on hand. Contractor will need to supply grout, adhesive, cement etc.
Require a new surround for the shower, new shower doors, possibly a new tub or tub insert, and install an exhaust fan in the bathroom. Also would like new faucet and drain for the shower.
House is 46 yrs old. Present shower has been there for approx. 30 years.
Dimensions of the tub/shower are: 58"x31"x66".
Dimensions of the shower door are: 58"x56".
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.
Click here to get started