We would like to remove a wall between living room and family room to connect them. The wall seems to be non-load barrier.
The family room floor then need to be re-do with new hardwood floor to match the living room.
Also, there is a wood-burning fireplace that we would like to convert to gas with new look rather than the existing bricks to let us install a TV on top.
Phase 2
Approximately 700 square foot area
Remove double front closet
Remove pantry to open up room
Remove all flooring and install new hardwood (material TBD)
Change location of gas fireplace and replace facing
Install gas for new stove
Add electric plug between French doors
Change some plugs to smart plugs (approximately 4)
Replace all baseboards and window casings (2 sets French doors, 3 other doors, 2 windows)
Remove part of ceiling (about 6 ft by 18"x 4" deep
Paint total area including ceiling & trim
Hi, I recently purchased my new home and am in two minds about moving my washer and dryer from the main floor to the basement and use the space (about 6 foot wide x 8 feet long) as mud room since this room is also connected to the garage access door. Given that I have 3 young children I was wondering if it would make sense to put a closet instead of having the washer/dryer there? Should I get the builder to do it or is it cheaper to do it after we move it by hiring a contractor?
Thanks,
Frida
I am in the process of buying a house that will need a lot of work! The papers have not yet been signed and I am trying to determine affordability in fixing many of the deficiencies of the house. These are a few of the things I will need done:
- basement is partially finished and will need to be stripped d/t mould found on some walls
- 2 basement windows need window wells and proper drainage. currently, there's none which may be contributing to water leaking in the basement
- exterior window sills are rusted and i want these all replaced with stone sills. there's about 4 windows at the front of the house, 1 side window, 1 back window, 1 bay window, and 3 basement windows. all windows will also need to be replaced as they are currently all rotted and inefficient
- the grading around the house is quite flat and so will need to be regraded to ensure drainage away from the house
- mould remediation in the basement
- there are no vents in the 2 washrooms upstairs...those would need to be put in.
- gutters are still in good condition but will need to be straightened in some areas
- roof is still in good condition but need a bit of maintenance such as fixing flashing
- backyard deck is rotted and needs to be removed and replaced. size is approx 5ft by 10 ft.
The house is 2300 sq. ft...excluding basement. I know it's hard to provide an unseen quote but I need it in order to determine my budget. I guess I'm looking for a general contractor who can do the abovementioned work...and I'd like to get a ball-park quote.
These are the other items that i'd like completed afterwards:
- walls are not even/smooth...so some areas will need some mudding and sanding
- painting the following rooms - living room, dining room, family room, hallway on main, hallway on second floor, 4 bedrooms
- all baseboard and door trims need to be replaced and painted
- at present, the kitchen has laminate flooring..would like this area tiled with ceramic
- kitchen cabinet replacement
I'm sure there's more but these are things I'd like completed...but the 1st list is priority.
Thanks
We are looking to get a price quotation for the construction of our commercial space.
Our unit is located on the ground floor of a condominium in Markham and the actual size is approximately 660 sq. feet.
It is a shell unit so please provide two quotations:
a) to build our office with washroom, floors, ceiling, one kitchen sink / counter, and other necessary basic/required items ONLY (such as HVAC, plumbing, electrical, lights drywall, flooring, connecting the condensate train, paint etc..)
AND
b) to build our office with washroom, floors, ceiling, one kitchen sink / counter, 3 rooms with glass doors/partition walls and other necessary items
- Regarding the three rooms, we plan to put the following :
o glass both in the doors and walls (fronting the hallway) of Offices A,B and C
o drywall in the partition wall of offices B & C
o all the other walls will be drywall
Estimated project start date - ideally September or October but we are flexible with the dates
I am interested in a quote for the removal of a load bearing wall in a townhouse in Markham. The wall currently separates the living and kitchen area with some decorative columns. The total span would be a total of 19 feet across. There is minor electrical (plugs and switches, thermostat) and a return vent (which can stay and be part of the new kitchen island). There is no plumbing in this wall.
I am removing a structural wall from my 28 year old home. I will be replacing it with a steel beam. The beam will be mounted so it fits flush with the existing ceiling. The ceiling joists will need to be cut on both sides of the wall being removed. You will have to bolt wood planks on each side of the beam. The beam will be pre drilled according to the engineer's drawings. Once that is complete the ceiling joists will need to be attached by joist hangers. I will be using steel poles on both ends to support the beam. They will be installed right in the wall. When complete, it will look like the wall never existed. Before any of the work above can begin, I need you to build temp. wall supports. I will supply on the materials.
I am looking for a carpenter who can do the work in the next 2 - 6 weeks. I only want those who have done this type of work to give me a quote for labour only. Please include in your quote the time frame you think this will take. I also need you to be licensed, have liability, guarantee your work & provide me with a contract. I do have a permit with the Town of Markham & all work will be inspected by the Town.
Thank you,
Jeanette
Want to find someone to give us advice and remove the load bearing walls (3-4) in markham. The main floor is approx 1500 sq feet and looking to make my 35 years home into an open concept. Need to do floors and new kitchen. Budget 30000. Will need someone with a team working for structural engineering and permit.
My parents bought an old house in markham,.
Its a bunglow.
they want to do the following:
->Expand washroom in basement by building stand up shower with tiles and glass door
->since the washroom is next to the water heater, it require the water heater to be moved next to furnace
Upstairs:
->hardwood floor in the house
->tiles in the kitchen with backsplash
->relocate fridge and stive - will require relocating wiring and building new exhast for the stive
->break kitchen wall to create open concept
->will require to move return air to another wall since the existing return is located in the wall where we want to break..
->Create new washroom, stand up shower with tiles and glass door and sink for my grandmother's room as we want to have separate for her.. but has to be built in a certain way so that down the years it can be sold
->Break a wall next to the master bedroom to open up the room that connect to another bedroom.
->build a walking closet with siding mirror doors
->If budget permit place a skywindow
Repair a Load-Bearing Post
One of the wooden load bearing post is bent and I see a few cracks in it. I was wondering what would it cost to repair this.
My suspicion is that the concrete footing that the post is on is sinking (I think) because I don't see any damage on the wood (ie rotting).
Please let me know how much it would cost me to repair the above.
Thanks
House is only five years old. Numerous Code violations in respect of roof, flashings, underlayment, lack of vents on Gable Roof portion, inadequate and unequal distribution of blown-in insulation has caused a lack of air space and the prevention of a free flow of air in the attic, no air vents to the roof, rotted wood under the roof shingles. Suspected ice dams forming in winter due to current roof design and construction. Roof is leaking in at least two known places into the Living Room, drywall damage, pooling of water on oak floor, cupping of oak panels, possible mold and mildew issues under the gyproc and under the floor.
I need a roofer, a drywaller, a mold expert, a flooring specialist, and an attic guy.
This is an all-in-one job that I need done, first to repair the roof, obviously, and then to deal with the collateral damage in the interior living space.
I need a General Contractor and tradesperson who has access to the skilled trades that can deal with a major repair job of this nature.
Do not contact me unless you can deliver on all aspects of this job. I want to deal with one person, not nine.
We would like to add shed dormers on the front and back of our one and a half storey house (I think it is cape code style). There are currently 2 bedrooms and one bathroom in the half storey and it is approximately 500 sq. ft. The addition of the shed dormers will increase the square footage to approximately 1000 sq. ft., giving space to create 1 master bedroom with 3 pc ensuite, 2 bedrooms and an additional 3 pc bathroom.
Info. about the house:
-The interior dimensions of the main floor is approximately 35 ft. in width by 25 ft. in depth.
-The house was built in 1954. We moved into the house 2 months ago, therefore we have limited knowledge of the previous renovation projects. With that said, I am not sure if the ceiling joists/floor joist for the upstairs require upgrading.
We are looking for an estimate for the project.
3 music studios:
Each studio 18' x 24" - 10' ceilings with 5/8" drywall.
Only 2 walls required in each studio (other 2 walls are existing) so 42' x 3 = 126' of finished walls ready for priming.
2 quotes please - one with sound reduction and one without.
Thanks
Gary
Hello,
I'm looking for a handyman/GC for various renovations, remodeling jobs in commercial sites at times. Right now I have one job to build small rooms in open space in one of the commercial sites I manage. Attaching the drawing for reference.
Red marked walls are the new walls to build with the front walls and doors with windows. Please feel free to reach out should you have any questions. Thanks
Hi,
There is an open concept family room with fireplace to be renovated to a bedroom on the second floor.
I’d like to get a quote (ballpark estimate cost for labour) and how long does it take to complete for the project that break into 4 parts as following
1, convert the open space to an enclosed room, add new wall and swing doors (either single or French double swing doors), may need to add/relocate power outlet and light switch on the new wall (Labour + materials)
2, replace second floor carpet to laminate flooring, we will pick and purchase flooring and baseboard (approximate 900-1000 sq ft on the second floor) (Labour)
2a, replace flooring in kitchen area (1st floor) and all bathrooms (TBD on available budget)
3, replace vanity counter top with new faucets
We are shopping for quartz countertop for replacing the kitchen countertop, we may have some left over quartz slap to replace vanity counter top, but we may need labour to replace the faucets .
We are looking to kick start the project around beginning of September, and hopefully it will be completed in 1-2 weeks. We want to get a ballpark figure and ideas how much for the whole project. Unfortunately, the house is not available to be see and inspect. Therefore, I hope the photos can help to give you some ideas about the scope of the project. Please feel free to give me a call if you want more information and chat about the project.
Hi,
I would like to knock down a wall that two rooms share in the living room area and convert it into one large room
I would also like to knock down the wall of the walk in closet for the Master Bedroom. This side of the wall is shared between the walk in closet and Master en suite bathroom. This way I have a smaller walk in closet, but more space for the bathroom
Would like one interior basement wall opened up or removed depends on structure & 1/5 wall removed depends on structure. Would like quote on exterior French door and a few windows added.
Also would like a quote on 1 interior french door to be inserted.
I am moving into this address in two weeks and have a painter coming in so I would like this done asap
Hi there,
I am looking to renovate a warehouse for a paintball style game:
- 6000 square feet
- Clearance Height 18 feet
What I am looking to receive a quote is on:
- Epoxy the entire floor
- Place netting to protect overhead lights
- 12 Feet high by 54 feet long fence (Pricing on a Wood, Metal Fence, Plastic)
Here is an exact example of the a place and style of design I am lookingclick here
I live in a Markham freehold townhouse which is about 8 years old. I have noticed watermarks/stains in the ceiling right above where my toilet/bathroom is on the second floor - There is no water on the bathroom floor so I am afraid something is going on with the subfloor/toilet. It does not seem that my tub or sink is leaking. I have ceramic tiles on the bathroom floor.
I am looking for some help on what I should do to figure out what the problem is: whether it may be a plumbing/painting issue, can you please give me some help with the correct contacts so I can get a quote to get this fixed?