I am emailing you to invite you to attend a project briefing at the specified address in South, Milton, Meet at Lobby) on Thursday, June 6, 2019 at 2:00 pm.
Office Space Reno – 2,414 square feet.
The objective of this session:
• Meet you in person (mandatory representation from your company);
• provide you the scope of work;
• provide you the drawings/package submitted to City Hall (may be subject to minor changes);
• tour as a group of the location in its current state even if you have been there before
• and take your questions (will respond to all contractors at the same time after gathering all questions)
One week from the tour, we would like an estimated cost for construction (sum analysis), and will be providing the template for the estimated cost via email tomorrow.
Thank you,
Marie
I am looking to rearrange and add to my existing kitchen as well as completely finish my basement (no kitchen or bathroom needed). Please feel free to contact me to schedule and estimate.
I would rather use my existing cabinets if possible. They are 4 years old from Mattamy. I will also need to add a double pantry and re arrange the counter/sink. As for the basement, it is a simple framing and finishing with 3 rooms (home theatre, storage and furnace/cat litter).
Thank you,
Jill
The house is a new house completed in the fall of 2008. Need to upgrade the standard materials installed by the builder.
I need a backsplash and granite counter tops put in. I also need a new hood and pot lights installed.
I need hardwood installed on the main floor and the staircase stained to match. The space is about 700 sq. feet.
Finally, i need new lights and granite counter tops installed in my master bathroom.
Hi there,
We are looking for a professional to install our assembled kitchen cabinets.
Wall cabinets are 36” high. Base cabinets are standard 24.5” depth. Cabinets are cherry colour with dark glaze // maple // ” plywood. Inside of cabinets is stained to match. Drawers are soft-close (all hardware is attached – ie. Hinges, drawer sliders) . We are looking at roughly a 9’ x 11’ space. We have 7 wall cabinets, 1 pantry, 4 base cabinets, 4 filler pieces, 1 x 9” base tray cabinet and the dishwasher cabinet. We also plan to use two extra base cabinets for the island. I will be working with Elite here in Milton for the granite countertop installation.
Any information on pricing, time required to complete job with the potential start date of April 30th would be greatly appreciated.
Looking for quotes on the installation of LVL's in 2 areas of a the main level kitchen. Beams will be supplied and delivered to the site. Your task is to open up ceilings, prep for installation of beams, install beams, close up ceiling and wall drywall and prep for paint, paint all affected areas.
Looking for a high level quote to do the following on main and 2nd floors to get an idea of costs and what we want to start with. Total of 3750 sq/ft, 5 bedrooms, 3.5 baths. Floor plans attached with room dimensions.
1. new hardwood flooring on entire main and second (minus bathrooms and laundry room). engineered wood, 7" wide plank.
2. new vanity/lighting/tile/toilet/tub or shower in upstairs bathrooms
3. new tile/vanity/toilet/lighting on main floor powder room
4. new windows on main and second floor
5. removal of wood burning fireplace on main floor
6. smooth ceilings throughout main and 2nd floors
7. new paint throughout main and 2nd floors
8. floating stairs (circular staircase) with iron pickets
9. tear down entrance wall to sitting room area and extend to make open to family/sitting room
10. tear down wall between sitting room and kitchen to make open concept
11. new tile and storage/cabinetry in laundry room
12.create butlers pantry from kitchen to dining room
House built in 1982 - requires new kitchen (configuration, counters/cupboards/appliances) including window fixes (two small venting windows to be removed /filled in) replacement window for kitchen and living room. Venting needs to be put in for powder-room. Maybe new floors - cork for kitchen instead of ceramic, hardwood for hallway/dining/living. Basement wall moved to be a) corrected and b) maximize space. Maybe hardwood or carpet upstairs. New Garage door with opener. Currently there is an ill placed fireplace - would love to move it - or change it to a gas insert . All have been listed in order of priority. We will need to purchase appliances - gas stove, french door fridge, over the range microwave, dishwasher.
We would like to open up the space on our living room and dining room. The work to be done is installing a support laminated beam (3 of 2x10's) across with 2 supporting studs on each side to transfer the weight from the studs to be taken out (3 studs).
WE are looking for a contructor/handyman to do the job right, we would like to know how they will do it and making sure that they will install a temporary support before removing the 3 studs that is bearing some weight above it. Should be experienced on doing this kind of job.
Note:
The electrical plugs that is on that wall will just be disconnected and there's nothing else on that wall. (the air return will be on the floor to be covered by grill as it is).
Painting - Main and 2nd Floor including doors, frames, baseboard and casing, ceiling of kitchen, powder room, 2nd floor common bathroom, master bedroom and ensuite and laundry room.
Popcorn removal and smooth finish ceiling - remove popcorn, skim, sand and paint living room and foyer on main floor.
Hardwood floors - Removal of existing hardwood floors and new hardwood floor installation (please include cost with supply of hardwood floors and without).
Stairs - Stain railing to new floor color, re-stain wood step to new floor color, prepare to paint and paint stair raise & stringer white, supply and install white spindles OR prepare to paint and paint spindles.
Back Yard - Stone patio flooring OR deck and landscaping.
Hello, We are looking for an experienced general contractor to perform home renovation/improvement projects at our house in Milton, Ontario.
Target Start Date: Mid-August
Target End date: Mid-Oct
Projects:
1. Turn 2nd floor Loft to a bedroom with closet.
2. Move AC from backyard to side of house.
3. Basement finish with basic 3pc washroom, storage built-ins, semi-finish furnace area. Note: to save costs, we will be doing the flooring for the basement ourselves and also bring in our own electrician.
4. Laundry room (2nd floor) cabinets and countertop (Low priority, if budget permits)
I have attached the floorplan from the builder as reference for rough estimates.
We currently are looking to completely remove one wall separating our kitchen and small dining room and install "pocket" french doors in the wall separating the small dining room and living room. The wall between the kitchen/dining room is just over 10' long and already has an opening located in it to allow access into the kitchen. The wall separating the dining room/living room is the exact same size and we are looking to install french pocket doors in it and close off the door opening that already exists in that wall. The easiest way to envision the 3 rooms would be to picture the kitchen on the left as a rectangle, the small dining room as a smaller square in the middle and the living room as a rectangle on the right. I am looking to remove the small dining room's left wall and completly close off and install doors on the small dining room's right wall. I am looking ideally for a licensed contractor who can determine if they are indeed load bearing walls, and then quote the job taking into account the proper permits/drawings needed to complete construction and close off the permit.
Our house was built 6 years ago by Mattamy homes. It is a great home but we would like to open up the space between the family room and dining room on the mail floor. The main floor has 9 foot ceilings and the 13 feet 9 inches with the doorway but we want to remove roughly 9 feet of the wall.
The wall has plumbing and air and an air vent.
Hi there,
We have recently bought a home as below: Its 50 year old Bunglow on 132 X 250 lot. We want to upgarde the existing bunglow with giving it a new modren look and double garage plus new family room , master ,one extra bed room and two washrooms. the existing covered are is 900sqft with 3 beds one washroom with 900 sqf basement. please provide us different options costs and designs to choose from. email corrospondence will be preffered.
Thanska nd regards
adnan
Need to remove the bulkhead over the chimmney. Its a brand new house with 10ft ceilings however as we didn't take the high kitchen cabinets, a 23inch bulkhead was build.all around the cabinets and the chimney was fitted below the bulkhead. this looks really ugly.
Could you provide and suggestions?
Whole house is approx. 1500 sq ft. Property owner.
1. Remove wall from galley kitchen to open it up. May need to support if supporting wall.
2. Install new kitchen (cabinets, counters, island, electrical, plumbing, gas line, RO).
3. New flooring throughout whole house (tile in kitchen and connected foyer, hardwood in dining and living room, hardwood in upstairs hallway, carpet or hardwood in bedrooms).
4. Cap and paint stairs.
5. Install new master bathroom and walk in closet.
6. Update current powder room (new toilet, sink, vanity, tile)
7. Closets for 2 bedrooms.
8. Divide one bedroom in two (put up wall).
9. Put in garage access.
10. Install new upstairs laundry.