the bathroom is 10 by 7.5 feet and needs to be re-do from top to bottom.
-remove old tub, toilette, sink, vanity, tiles and wallpaper
-install new tiles (floor and wall)
-install new tub, toilette, vanity
-paint (walls and ceiling) - some drywall may need to be changed by the bathtub
-we built a 4 shelf unit that has already been framed but still needs to be drywalled
-remove old stuff
-we would supply the accessories and install that ourselves
a complete new bathroom for the master bath. The house is around 13years old. The old stuff will be removed. Need a new shower enclosure (glass) with water tile and body spray (plumbing will be required). Shower is my main concern. Need quality work.
A new tub needs to be installed.
Will need references for similar job done previously as proof of workmanship.
I am looking to have some renovation work done in my master bathroom.
1. There is currently no fan in the washroom for external ventilation of the moist air. I would like to have one installed
2. I would like to have the existing countertop and vanity replaced with new ones (note I have already decided on the vanity and countertop, so I am just looking for someone to do the takedown of the old and installation of the new)
Looking for contractors to flip my bathrooms. It's on the semi-basement floor(likely concrete under the sub-floor). The size of the room is about 5.7f*11.5f. I want to remove the bathtub and replace it with a shower kit, replace the surrounding dry wall and ceiling drywall, get rid off the vinyl floor tiles and replace with ceramic tiles.
The vinyl tiles looks pretty old and I'm not sure if it contains asbestos or not. So I'm also seeking advices about how to deal with the floor.
Thanks in advance
BATHROOM RENOVATION
• REMOVE AND DISPOSE OF 3 PC BATHROOM TILE AND DRYWALL DEMO IN TUB AREA AND DISPOSE AND ELIMINATE MEDICINE CABINET
• FULL GUT OF DRYWALL BATHROOM WALLS, CEILING & RE DRYWALL
• CONVERSION OF TUB TO WALK IN SHOWER INCLUDES INSTALLATION OF SHOWER CURB, SHOWER PAN LINER, SHOWER FAUCET, DRILL LESS SLIDE BAR, DENSHIELD BOARD, TILES IN SHOWER AREA, MARBLE SHOWER STEP, GROUT AND SILICONE
• SUPPLY & INSTALL TILE FLOOR UP TO 12"X24" TILE
• SUPPLY & INSTALL TOILET
• SUPPLY & INSTALL 60" VANITY WITH TOP, SINK, FAUCET AND MIRROR
• ELECTRICAL PERMIT
• SUPPLY & INSTALL LED POT LIGHTS CENTERED IN BATHROOM
• SUPPLY & INSTALL LED SHOWER POT LIGHT
• RELOCATE ELECTRICAL FOR VANITY LIGHT TO BE CENTERED ABOVE SINK
• SUPPLY & INSTALL NEW GFCI -REPLACING EXISTING
• SUPPLY & INSTALL NEW EXHAUST FAN INCLUDES QUIET SERIES PANASONIC AND VENTING THROUGH ROOF
• SUPPLY & INSTALL SHOWER DOOR
• SUPPLY & INSTALL ACCESSORIES - TOWEL BAR / TOILET TISSUE DISPENSER / TOWEL RING
• SUPPLY & INSTALL VANITY LIGHT
• CONSTRUCT NEW SHOWER BENCH SEAT WITH MARBLE SEAT
Size 120 sq ft
Project:
- remove bathtub, double vanity and existing shower stall
- remove and replace ceramic tiles on floor (new porcelain tiles supplied)
- build enclosure with door for toilet
- build new shower stall with waterproof membrane
- tile shower walls & ceiling
- complete any minor plumbing modifications for new layout
- install new shower plumbing hardware and shower doors
- install new toilet
- install new vanity (supplied)
it is a small bathroom (8x5) with a toilet, vanity/sink. We need to add a shower. There is room in the bedroom closet behind bathroom to increase bathroom size to accomodate the new shower. The old vanity is also too small and will need to be replaced. Toilet can possibly remain in the same location. New flooring will also have to be replaced.
Hi,
I am looking to redo my bathroom which includes replacing the old tuv faucets, retiling the walls of the tub, retiling floor (only 25 sq foot area approx.), installing new vanity n new toilet seat. It is a small bathroom n I would appreciate your quotes. I will only supply the tub, vanity, tiles, faucets n toilet seat. Please let me know the quotes.
30 year old house
rip out old stand up shower stall kit 32" x 32" in a basement apartment
create a base / build up a base (such as in a condo) to level / move over a crooked drain pipe (without ripping into the concrete)
install new acrylic stand up shower stall kit 32" x 32" in the same place
shower stall will be purchased by the customer
the quote is needed mostly for labor
hoping to have it done in a weekend (3days)
some mold is present on the surrounding baseboards
I would like to renovate our main bathroom on the upper level. It is pretty small. I would like to change the sink, vanity, mirror and remove the tub and just have a shower.
I would also like to add a bathroom/laundry combo in the basement. Hopefully with a tub, or at least a shower.
Eventually, kitchen maker is in the wish list.
Looking to get quotes on a bathroom renovation for a small 2 piece Master bedroom ensuite. Work will involve:
- Tiling
- Replacing Vanity
- Replacing Mirror
- Installing Vanity Light
- Installing Grab Bars (these would be in more than 1 bathroom).
Would also be looking to have the following minor work done in other parts of the house:
- Outdoor Grab Rail installed at front steps
- Replace toilet in another washroom (change from standard toilet to ADA compliant)
Location is Mississauga.
Our home is Raised Bunglow (Semi-Detached) in Malton, Mississauga. Our is a old style wahroom (3 -piece) and has small floor tiles. We want to completely renovate the washroom.
For master bedroom closet, we want to extend it by breaking the walls on both sides and extend it (wall to wall closet)
Please advise if you need more info like dimensions .
We are planning to renovate our bathrooms ( en suite, Main and powder room)
Ensuite : Removal to existing vynl tiles and install ceremic tiles, convert the tub to shower some electrical work too
Main washroom: Removal to existing vynl tiles and install ceremic tiles, and connect the vanity some electrical work too
Powder room : Removal to existing vynl tiles and install ceremic tiles, and connect the vanity some electrical work too
Kitchen : Remove dishwasher, Removal to existing vynl tiles and install ceremic tiles, and some plumbing work for the fridge and dishwasher plus some electrical work too.
Scope of work: finish 3 bathrooms fully
Planning to start end of September/Beginning of October
- bathrooms have been gutted
- plumbing and electrical rough in will be completed
The following materials will be supplied and are already on hand:
all shower/floor tiles
toilets
faucets
shower systems including valves (already roughed in)
vanities
Shower glass should not be included (will procure separately unless you have a good supplier) .
The following materials should be included along with any other materials to finish the bathroom:
Tile backer: denshield drywall, etc.
All waterproofing Redguard/Kerdi/etc.
Shower drains: black in color
Shower/niche jambs/threshold quartz/stone
Thinset/mortar/Grout
Tile edge (black/chrome depending on room)
Plumbing u pipes
Quarter turn shutoff valves for vanity/toilet water lines
Ready to find a supplier: Please respond asap!
I am looking into getting my bathroom completely renovated. remove bathtub and floor tiles. Install new toilet, vanity, new floors. Install new shower walls (subway tile), vanity lights, shower panel, shower niche, vanity faucet, baseboard trim, exhaust fan, towel ring, paper holder, towel bar.
Please let me know what the cost or range roughly would be?
How long will this project take?
Thanks,
60" * 30" LH Bath Tub
30" Vanity with Quartz Top and Undermount Sink and Fauctes
03 Ceramic Wall tile ( Total of app. 5.6 m2)
01 pc Toilet
Border Tiles App. 7 sq ft
Floor Tile App. 3.6 sq mt (Optional)
01 Mirror
No compromise with Mat. / Schedule. Prefer Quote - Options Labor + Mat. / Only Labor.
*** Condominium
Want to Start / Go ASAP with the competitive one.
1) Remove part of the wall and install a double or 60" shower glass door.
2) Install seperate water lines and add a second shower (I will provide the shower system).
Please provide combined and seperate quotes for both items.
NOTE: The work is requried to be completed during the month of September. Please reply to this posting only if you can complete installation by the third week of September.
Thank you.
Install marble/grantie (or similar material) vanitytop with double sink. App. size 60" X 22"
Please provide quotes for material plus installation and installation only.
NOTE: The work is requried to be completed during the month of September. Please reply to this posting only if you can complete installation by the third week of September.
Thank you.
Complete overhaul of the main bathroom on the second floor of our side split house. The house was built in 1959 so the bathroom footprint is rather small so looking to make it appear bigger, more storage, more modern. Also would like to instal a fan (currently no fan) and a pocket door to provide more room overall.
We need to gut our second floor bathroom, which is approximately 90 square feet (which includes the foot print of the tub). Here is the basic scope of work:
Remove existing, and reinstall all drainage for bath tub.
Remove/replace existing drainage for a single sink, and convert plumbing to a double sink vanity (which is in storage).
Rooftop pipe venting and exhaust fan necessary.
Extend toilet drain pipe or flange.
Repair any electrical as necessary.
Rough-in three electrical boxes for sconces, possibly install 2 halogen pot lights in ceiling.
Install new bath tub.
Install new dry wall for walls which have been removed for plumbing and electrical access. Primer, paint and tile ready.
Install new cement board or Schluter System around tub surround. Tile ready.
Install Schluter System or self-leveling cement on floor with in-floor heating. Tile ready.
We plan to install all tile, sconces and paint ourselves. However, we would like a separate quote for doing the tile work.
Design plans available upon request.
I will require a minimum of five references. References for bathroom renovations preferred.
Accurate and clear time estimating is required. Time is of the essence.
Thank you for your consideration.
Vincent C