I need a kitchen installed in a previously finished basement. I have the cabinetry (used), which needs a bit of repair. I will need a laminate counter top, a sink and plumbing, a stove wire and outlet installed. The drainage path for the sink is shown dotted. This may involve either going above the slab and replacing the old clean out, or digging into the concrete in the unfinished space. Bathroom fan also needs to be repaired or replaced.
In addition I will need a second seperate quote on the cost of laying laminate in the entire Living / Kitchen area (I will decide if I am doing this as well based on cost).
Work can start immediately.
I'm looking for a quotation on two projects I would like to do at my home in Oshawa, Grandview & Rossland Rd.
Kitchen Reno
Move existing pantry to end of cabinets, filler as required, repair baseboard.
Update Kitchen Countertop with laminate countertop.
Install new mosaic backsplash with grout.
Install new double sink, above counter, & Moen faucet (Supplied).
Basement
Supply / Install Framing & insulation for office
Supply / Install Drywall & finish
Supply/ Install electrical, 1 Light Fixture, 4 outlets, 1 Media Outlet.
Supply/ Install 1-32€ Access Door, 1- Access Panel, Install 32€ door, Supplied
Supply / Install Lam Hickory 12mm laminate flooring
Supply / Install Dricore Sub Floor
Supply / Install baseboard & casing
Supply/ Paint, 2 coats - walls, ceiling & trim
Full Site Clean Up
The basement is partly finished. It already has 1 bedroom and a bathroom. We would like to have a legal basement apartment, which would, of course, include a kitchen, living room a second bedroom and possibly a tub in the bathroom bathroom. This unit is to be a legal basement apartment so we want someone who has experience obtaining all Oshawa permits and dealing with the City by-laws getting all the proper documents required.
Hi,
I'm looking for someone who is in the business of waterproofing and underpinning. I need my basement legalized, therefore I need to dig out existing floor and drop it by about 16" or so. Quote should include getting proper permits from the City, structural engineer drawings etc.
Quote does not include framing walls, just dig out and pour of new floor+waterproofing.
I am in need of finishing a basement in-law suite which I am attempting to turn into a rental apartment. The issue is that once you go down the stairs from the side door you are within the apartment without any privacy. I also have the laundry room which will be shared yet to get to the finished downstairs washroom, you must pass through the laundry.
So the issue will be seperating the laundry room from the basement apartment by enclosing it. Sealing up the door contecting the laundry room to the washroom and installing 2 new doors. Adding a wall to seperate the upstairs main floor with the basement area.
I would like sound proofing to be installed from the main floor to the basement area as well as insulation in the laundry room which is freezing in winter.
It's a project you must view to provide an accurate quote.
I wood like the quote for all materials using drywall as the finished product and advise if you are available after 5pm during the week to provide a quote or during the weekend.
Regards,
R.Browning
30 year old house with finished basement and two piece bathroom. Rec room is old, outdated and dingy. Rec room is about 500 square feet and bathroom is 6 feet x 4 feet. Flooring is carpet and linoleum and needs to be torn up and thrown out. There is a stairway leading down to the basement with 10 stairs that is finished the same as the basement. We would like to renovate and are open to suggestions as to what to do, and types of materials to use We are not in a rush but would like to do something soon.
1) Need to add 3 new rooms ie put in dray walls, some electrical rough ins already there
2) one 4 pc washroom.
3) open 1 room so living area is more
4) Add 1 new window in basement in living area
5) may require removal of plywood walls and make them drywall/ceiling for the basement ( in already finished areas), to support fire code.
Hi,
I need the main floor bathroom remodelled and the large basement apartment laundry room dry walled, flooring and completed to code, the washer and dryer needs to be moved to the large kitchen area. House closing is Jan. 19 and these projects need to be completed by Feb. 13, 2015. Please contact me if you can meet timelines. There are other renos as well but they are not with a date deadline.
Please submit your information if you'd be available and qualified.
Thank you for your kind time and consideration.
Brenda
I would like to renovate the basement. it's a 3 bedroom, 1 bath, basement. The contractor needs to review the basement and provide material cost, time to update it to rent.
- Kitchen cabinets updated/repaired
- new or newer appliances
- plumbing repaired
- new toilet and vanity (tub looked fine to me)
- apartment painted
- maybe new flooring throughout ; laminate perhaps
- other fixes (closet doors back on tracks or replaced, doors fixed, etc.)
Free quote for each of the below items individually required to shortlist the contractors for a property in Oshawa close to Oshawa shopping center.
1) separate entrance plus cost to get building permit, 2) small basic kitchen with kitchen fan, 3) one bedroom in basement 4) shower tub fitting withless or no washroom renovations, 5) laminate flooring, 6) pot lights for basement and 7) keeping two separate laundry for up and downstairs
How long will it take to get building permit for separate entrance? What would be the cost for getting permit? Please advise. Please know we are short listing the contractors and we may do this project in near future or, we will get the building permits at first or soon and then decide in near future. Kindly email and then give a call. Budget $5000 to $20000 including labour and materials.
We have an unfinished basement that we would like to renovate as a family room (theatre style set up with a second room at the opposite end).
We would like to consider quotes based on the inclusion of a powder room-type washer and also without one.
We started this project last year, but never made it passed the planning stages. I have attached a drawing that a friend of ours prepared when we first started compiling paperwork for permits.
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.