Ever wonder what you're neighbours are doing to improve their homes? Discover what other Sarnia homeowners have planned for their General Contracting projects by reading the details of their request for quotes below.
In total, TrustedPros has received 19 General Contracting projects posted by homeowners in Sarnia seeking the services of local General Contractors. Total estimated value of these projects is $587,000.00 with a per project average of $30,894.00.
If you're in need of a contractor for your General Contracting project, use our job posting tool to get matched to local pros or browse our directory of General Contractors in Sarnia .
We are looking to have my father's semi updated and repaired. He needs a new bathroom installed, flooring upstairs and on the staircase, painting refreshed, a ceiling in one bedroom needs to be re-dry walled and painted, closet doors need to be updated. Possibly have the kitchen painted along with the cabinets and back-splash installed. Other minor jobs as well.
This home is 140 years old. There is wallpaper on ALL the walls. The roof probably needs to be replaced. The main bathroom has to be upgraded, along with the kitchen. There are a few windows that need replacing and flooring to be refinished an/or replaced.
The job needs to be started May 17th. 2016. Access before then is possible with 24 hours notice - starting April 6, 2016.
I am an optometrist needing some minor renovations to make the new office space more suitable. First I need to get rid of a non-load bearing wall. Secondly I need to have a large window cut in another non-bearing wall to create an open concept so the staff can have a clear line of site from the front desk into the frame display area. The window will be left open with trim ( or have hardened glass put in it).
Approx 170 sq. ft. tile in the basement so it is tile to concret. Need to remove tile and motor to smooth floor for new tile installation. Install and grout new tile. Area need to sealed off from remainder of house due to the dust involved in removing existing tile and mortor. Should be able to remove tile and motor in max. 2 days. Disposal required. E-mail Ted to set up for estimate....Thanks
We currently have a roughed in shower in our basement that requires to be finished. The work needed to be done would be the following to the 3'x3' shower:
1. Line with waterproof board,
2. Finish ceiling with lighting and fan,
3. Tile inside of shower,
4. Install fixtures,
5. Install glass shower door
All materials for project will be supplied, just need someone to install everything. Best to have a look by coming by to look at the project.
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.
Click here to get started