We own a townhouse in Langley. There was a murphy bed installed in between a bedroom wall and garage wall in 1994, strata had asked for structural engineer to look at it. having that done his finding was that it was installed in a load bearing wall without a proper header his recommendation is that we need a header installed and we need the wall to be sealed properly so no fumes etc from garage get into the bedroom.
Remove all drywall from basement, replace furnace and all ducting, reno 3 piece bathroom in bsmt and laundry area. Install all new windows and doors, reno kitchen and 4 piece bathroom, replace BR and closet doors, remove and replace flooring. Close in,
carport to be done first for storage of interior . Paint, seal spackle ceilings.
Will have to done under abatement, asbestos in drywall compound, spackle ceilings and furnace ducting tape. Split entry, 2200 sq', owner, eco friendly materials, only top floor to be finished maybe drywall basement.
I want to turn my crawlspace into a basement. Basement will be finished in the future for extra living space or a suit.
House Details:
Built 1994
2 story: 1400 sq on mainfloor, 1800 sq feet on upper floor (added space over the garage).
Total: 3200 sq feet
Crawlspace:
1400 square feet.
42 inches high to bottom of the joists
Cement Floor
Footing Depths: Unsure
I would prefer to have a whole cut in the foundation wall.
Then dugout the basement.
Then underpin the foundation.
Then pour a new floor.
Complete an outside access down with steps outside.
The completed height will need to be 96 inches from floor to bottom of joists.
Open to raising the house 2-3 feet and digging down at the sometime.
Not likely open to raising the house 4-5 feet with no digging down.
I currently do not have permits, plans, or drawings.
Willing to begin the job as early as weather and permits/plans will allow. Would like to begin by Fall 2015 at the latest.
I'm interest in estimates for my reno project. I would prefer a build and design team/firm that has strong emphasis on time management as well as a good reputation and references in the community. That will over see the project from start to finish including structural engineer. I want to build a second level 2000 square addition on top of my 1600 sq foot 32 yr bungalow including enclosed double garage with rec room on top 3 br 2 ba kitchen dining balcony
We have just signed leases on three (3) new locations and took possession Aug. 2nd in Richmond, Port Moody and Langley with three more to come within 12 months. Basic retail store mostly in good conditions with minor work. Site conditions of above are very good with only Langley needing most of the work. sqaure footage are 1385 sf, 1367 sf and 2038 sf respectively. Easy job. Retail set up. No Millwork as we supply cabinetery already build and just needs to be installed. Budget for all three location is $70,000.00 including taxes, material, Labour, mechanical and electrical drawings. We have architectural drawings already completed and ready for bidding. Great opportunity to work with an international franchise with over 120 locations and looking to expaand into BC. estimated time to complete all three location should not take more than four weeks from time building permit is aquired. We could apply for building permit if needed. Contracted must be WCB compliant, licensed and insured. Landlord also required a signed Statutory of Declaration. Please feel free to contact me locally with any questions. We are open for bidding starting tomorrow and will are looking to award the work to qualified company by next friday August 12, 2011.
1. remove exist. kitchen cabinet, build and install new cabinets and countertop
2. remove exist. carpet/wood flooring, leveling, install underlay, new engineered hardwood floor
3. remove existing 2 bathrooms cabinets, plumbing fixture, install new cabinets, countertops and corner bathtub, install 1 or 2 wall hung toilet
4. demolish exist. partition wall, install new partition wall
5. demolish exist. fireplace, install new stone face fireplace with wood mantel
6. patch and paint entire unit ceilig and wall
I have a 5 foot portion of my living room wall that is bumped out and contains my electric fireplace. I would like this removed and made flush with the rest of the wall. There is one switch located on the side of the bump out for the fireplace. This would need to be relocated.
Ideally demo is included but i could look to do this myself if necessary. I would need the top bulk head (as pictured) matched and the drywall taped, and sanded. I am happy to deal with the priming and painting afterwards.
Additionally, there will be a small portion of flooring that would need to be addressed. I have vinyl plank and removing this will expose an unfinished section. I do have additional boards for install on hand.
I would Like a Quote on a
110' long X 30'High insulated wall with a 6mm Polly and Dry wall on both sides.
Should be Steel Stud frame, Fire and Quake proof approved.
One double man door off to one side.
The reason is to cut the noise and dust from entering both rooms.
I am looking for local contractors in the Lower main Land district.
Good Evening,
We are looking for a quote for our home addition/renovation. Attached are the structural engineered drawings and the architectural drawings. Please let me know if you are able to provide a quote and how long it would be to complete. Also, please let me know if there is a need to get together to discuss the project in more detail.
Any questions or concerns (or if the files do not open) please let me know.
Looking forward to hearing from you.
Dean