I need a wall removed and a door installed in a 900 square foot office space located in a commercial building in Ajax, Ontario. The first two pictures attached are showing the wall that needs to be removed, to open up space between two smaller offices. The next two pictures are of the same wall from the other side. The last two pictures are where a door (or something to separate the space) needs to be installed. The office is available day, night and weekends and I would need the job done as soon as possible.
Thank you!
We are looking for the following:
(1) Ripping out and disposal of carpet (approx. 700 square feet) and installing laminate flooring
(2) Electrician to clean up box (up to code, but needs to be cleaned up) and turn outside plugs (2) to GIF
(3) Rip carpet of stairs (2 sets of stair) and either refinish what's underneath or install new steps
(4) Move laundry room to another area of basement and install bathroom where laundry room currently is - most of the plumbing is there already
(5) Put a window opening between living room and kitchen and install small countertop there (enough room to have 2 bar stools underneath and sit at to eat)
(6) Drywall over stucco wall (one large wall, and one very small section of wall)
(7) Remove the glass doors on the upstairs bathtub and install a curtain rod (ensuring that all holes/discolour ation are fixed)
(8) Regrout the tiles in the upstairs bathroom
We take possession of our home on October 8th, and would like the work to begin as soon as possible (ideally, Oct 9). The home is located in south Ajax (we currently live and work downtown, so we can make an appointment to get into the house evening and weekends).
We would like to have everything in place by Sept 25, as we are going away from then until Oct 5.
Please note: You must have a GL in place, and be able to provide a certificate of insurance if we hire you.
Thank you.
-Peter and Lisa
We have a balcony door that leaks in garage. The caulking on the door was loose that caused the water leak into garage (it happened once or twice in the year). The garage roof is insulated by foam. The foam kept the joist wet for years and rotted it at the end (1.5 foot damage). The base flooring also got damaged around the area. At present 2 joist (left and right side of the door) has water damage.
1) replace / repair damaged joist
2) repair base flooring that got damaged ( 2 sqft)
1. Our Garage has 12 feet ceiling and its dimensions are 20x19 feet. There is currently nothing on top of the Garage and I would like to build a room by dropping the Garages ceiling from 12 to 9 feet and finishing the area above the garage. This should give us an area of about 10 by 15 with 8 feet sealing.
2. Need the on suite bathroom on the second floor renovated.
Need someone to come take a look and provide quote.
I am looking for a subcontractor to do a seperate entrance for a legal basement unit. The basement is located in Ajax and I am looking for someone with availability in the next few weeks. Subcontractor must have their own insurance and have knowledge of building code for seperate entrances. We have permitted drawings in hand. There will also be some extra excavation work required. Contact me at 2898308843 if your company is interested in working with us.
- KITCHEN: Granite counter top, backsplash, replace sink, dishwasher, cabinet refacing, base lights
- BEDROOMS: berber carpet or hardwood install (take out existing carpet)
- PAINT all walls
- WASHROOMS: new toilet install, new countertop and/or vanity
- ROOFING
- FIX part of external wall
Need to open up the living room to the kitchen...99% sure its a support wall...need somebody to take it out and put in a beam that spans 13-14 feet....need estimates...send email if you can provide this service for me..thank you...
sorry about the lack of information on the first post.
i have been getting responces back and some of the quotes seem to be pretty high....this is where the project is now...all the old dry wall is down and its down to the frame...all i want done is two pony walls to be put up then the beam put in place and i will finish the rest...drywall, plaster, and painting...sorry for the confusion...hope this helps.
turning an exsisting bedroom into a master ensuite bathroom including walk in shower and corner tub, his/hers sinks.
Bricking and drywalling in an exsisting patio door.
duct work (moving exsisting duct work to ensure proper heating in the basement)
moving a furnace and hotwater tank a few feet to allow for space.
insulating the basement with foam
build a bathroom with walk in shower in the basement (roughed in)
putty, and sand the drywall already in the basement.
I am looking to underpin 20 feet of my existing foundation on my 2 story home in Ajax, Ontario.
Contractors can come to view the area only on Monday, August 29th and Tuesday, August 30th. Work must begin on Wednesday, August 31st.
UNDERPINNING REQUIREMENTS
- Concrete Strength for Underpinning shall be 20MPa at 28 Days Min.
- Underpinning Concrete shall cure Min. 48 Hours before grouting and proceeding to the next stage
- Clean the underside of the existing footing or foundation wall prior to pouring concrete
- Underpinning shall be Max 1.2m (48") Long
- Shore and brace where necessary to ensure the safety and stability of the existing structure during underpinning
We just bought a <30 years old house. It's 2000 sqf without the basement which is unfinished. We're looking on having a few updates done prior to moving in.
First floor has a powder room, a dining room, kitchen, family room and a living room. Second floor has 3 bedrooms and 2 baths. The house currently has a hectic mix of floors, paints, etc. The jobs we're looking at are:
1. Wallpaper removal (hallway and staircase)
2. Laminate floor and carpet removal from first and second floors, staircase, powder room. (2 bathrooms upstairs will remain as they are)
3. Popcorn ceiling removal from throughout the house (excluding dining room and kitchen)
4. Painting the whole house (1 color throughout)
5. Install engineered hardwood floor (1 type and color throughout 1st and second floor)
6. Powder room: tile floors, paint, change the toilet and potentially the vanity.
7. Staircase finishing
Notes: We take possession on July 14 and we would like to have all of the above done prior to moving in. I would appreciate a quote (time and money) on each of the jobs and your availability for a house visit and measurements. If you have any previous work done that you'd like to show me, please mention it in your response.