Upper rear dormer needs vertical (board and batten) dark grey vinyl siding (approx. 200 sq.ft.) Black metal eaves, downspouts, soffit, fascia, window capping (approx. 30ft. total eaves). Recent new roof with step flashing and ice and water wrapped up the sides of the dormer. Will likely need a new layer of plywood and Tyvek on the dormer. I have 7/16" OSB on site you are welcome to use. Very easy access to back of house from wide alleyway and 12ft wide gate. You can park trailer and equipment on site easily.
I hade a new sunroom addition built this summer but the windows and siding are improperly flashed. I need a siding professional to provide me with a quote and to preform the work to either make repairs to the existing installation or remove the existing flashing and siding and install new product to proper window flashing requirements. Remove existing roof flashing and replace with new flashing that is cut into the brick.
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.
Click here to get started