Ever wonder what you're neighbours are doing to improve their homes? Discover what other Alliston homeowners have planned for their Bathroom Renovation projects by reading the details of their request for quotes below.
In total, TrustedPros has received 18 Bathroom Renovation projects posted by homeowners in Alliston seeking the services of local Bathroom Contractors. Total estimated value of these projects is $236,500.00 with a per project average of $13,138.00.
If you're in need of a contractor for your Bathroom Renovation project, use our job posting tool to get matched to local pros or browse our directory of Bathroom Contractors in Alliston .
City | #Projects | Total Value | Avg Budget |
Barrie | 202 | $3,326,500.00 | $16,467.00 |
Newmarket | 46 | $751,000.00 | $16,326.00 |
Keswick | 20 | $356,500.00 | $17,825.00 |
Innisfil | 37 | $613,000.00 | $16,567.00 |
Angus | 12 | $210,000.00 | $17,500.00 |
Bradford | 18 | $277,500.00 | $15,416.00 |
Alliston | 18 | $236,500.00 | $13,138.00 |
I need a complete bathroom renovation, powder room.
Install vinyl plank flooring on main level and bedrooms and removal of all carpet.
Carpeting on stairs and upstairs hallway
New front door, new door to garage
Door replacement and repair frames in upstairs bedrooms and bathroom
Light installation, blinds and curtains to be hung and more...
I am prepared to go over $20,000
I am looking to have the main bathroom made larger and add a shower stall (not prefab). To do this the current closet would be used in the space required as well as a porption of the bedroom. The Tub and toilet will have to move and this will require relocationing the drains and vents. All new tiles on the floor because the floor will have to come up. The shower stall will need the water seal filiments and be tiled as well. I will submit samples of the tiles and the contractor can match for price or allow me to purchase.
Looking forward to hearing from some good contractors in the area. I am a handy person but do not have the time to tackel this one right now.
Thank You
L- 12' 2"
W-1/2 is 6'5" 1/2 4'5"
2 entrances Main and off bedroom One off bedroom will move when new wall is constructed.
Current walls are plaster with tiles.
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.
Click here to get started