Cost to Build a New House

Question Icon
Posted by: from Brampton
10/7/2020 at 5:06:06 PM

I like to build a new house in Brampton or Caledon on a 1 acer land. I am in process of buying a land but like to know how much a new bungalow with loft or a two story house between 4000 to 6000 sq.ft. will cost .

Please provide me cost of each steps in details if possible.

Steps and costing to Build a 3000 to 6000 sq.ft. House.

1 Prepare Construction Site and Pour Foundation

Apply for and Acquire Permits

Construction Crew Levels Site

Dig and Puts Up Wooden Forms for the Temporary Foundation

Footings Are Installed (Pour foundation, Slab Garage and Basement)

Inspection #1

2 Complete Rough Framing

Check Foundation level/square prior to framing & installing doors/windows

Floor System, Walls, Ceiling joints and Roof Systems Are Completed

Sheathing Applied to Exterior Walls, Covered With Protective Wrap

3 Complete Rough Plumbing, Electrical and HVAC

The Following Are Installed:

Pipes and Wires - Sewer Lines and Vents

Water Supply Lines - Bathtubs, Shower Units

Ductwork for HVAC System - HVAC Vent Pipes

Inspections #2, #3, #4

4 Install Insulation as required per building codes

Fiberglass - Cellulose - Foam Mineral Wool - Concrete Blocks

Insulation Concrete Forms - Spray Foam - Foam Board or Ridged Foam

Structural Insulated Panels

5 Complete Drywall and Interior Fixtures, Start Exterior Finishes

Drywall is Hung and Taped - Texturing is Completed

Primary Coat of Paint is Applied

Exterior Finishes (Brick, Stucco, Stone) Are Installed

6 Complete Interior Finish

Doors, Window Sills, Decorative Trim Installed

Kitchen Cabinets & Granite Counters, Vanities, Fireplace Mantles Installed

Install Hard Surface Flooring (Hard wood) and Countertops where required

Install Ceramic tile in the Hallway and Kitchen area.

Mirrors, shower doors and carpeting are installed and final cleanup takes place through out the house

Final Coat of Paint through out the house

7 Complete Exterior Walkways and Driveway

Exterior finish grading is completed to ensure proper drainage away from the home and prepare the Walkway, Driveway and yard for landscaping.

8 Finish Mechanical Trims; Install Bathroom Fixtures

Light fixtures, outlets and switches are installed and the electrical panel is completed. HVAC equipment is installed and registers completed. Sinks, toilets and faucets are put in place.

Inspection #5

A building-code official completes a final inspection and issues a certificate of occupancy. If any defects are found during this inspection, a follow-up inspection may be scheduled to ensure that they've been corrected.

9 Prepare and Install Walkway and Driveway as required.

Trees, shrubs & grass are planted and other exterior landscaping completed.

10 Final Walk-Through

This is where you spot items that need to be corrected or adjusted!

Thanks,

Sure Sagar

REPLIES (1)
User Icon
Mark from CMJ Renovations in Oakville
Date/Time10/7/2020 at 8:45:51 PM

Cost of building is any where from $200-$300.00 per sqft, the detail you are asking for isn't reasonable with out drawings. No one will give you the detail you are asking for.

Search the TrustedPros directory and discover the best contractors in your area.

Find your home service pro
Great renovations start with a great contractor.

Since 2004, TrustedPros has been helping homeowners find the right contractor for their home improvements and repairs.

Post Your Project

Within hours you'll be comparing offers from top-rated professionals. It's free to post and you're under no obligation to hire.

 
Trustedpros Inc. does not warrant the accuracy, completeness, safety, legality or usefulness of any Content, or Whether Content is Current and up-to-date, and TrustedPros Inc. Shall have no liability whatsoever with respect to your use or reliance upon any content or for content being removed or otherwise ceasing to be available. Please refer to the terms and conditions of use of this websites for more details.
Categories

Get quotes from top-rated contractors

x