My house is 1900 sq foot. we would like to finish the basement with the following included
1. a 3 piece bath (stand up shower)
2. an extra bedroom
3. enclosed washer and dryer room
4. enclosed furnace system
With the rest of the space as the entertainment area for the family. How much would this project cost?
How long would it take to do this? this house is about 10 years old and already has insulation in the basement. The preferred materials for the flooring would be laminate wood and would like potlights in the ceiling. Would like a quotation please.
Sincerely,
Mrs. C.
Looking to have a basement finished for additional living space. Approx 750 Sq FT' with 1 bedroom and 1 3 piece bathroom, the rest of space to be open with the furnace and hotwater tank enclosed.
Striaghtforward build with laminate flooring, insulation, soundproofing and oak staircase with spindles and rail.
Townhouse / Rowhouse was recently flooded due to the significant amount of rain / flooding storm that the GTA encountered (July 8).
Water flooded into the Basement due to back up from street / city main sewer drain. Currently (as at this posting) water level in Basement was knee high. Extensive damage is anticipated once all water has been drained out and basement has been dried.
Immediate Priority - seeking an expert to Drain Basement and Dry
Next Priority - assuming Dry Basement seeking expert to assess the following:
Damage Repair to Cement Flooring
Damage Repair to Walls / Wall covering
Electrical Inspection due to Water damage
Hallway + powder room 1
Demo of tiles and trims and replace throughout hallway and adjoining powder room. Install new bathroom door, vanity, toilet and relocate bathroom light and paint. In Hallway frame and build a new front entrance closet.
Basement main area
Demolition of walls and ceiling , new doors to furnace room, new bulkhead, laminate floors, potlights, new outlets, switches, trims, new closet, new drywall, and paint.
Basement laundry room
Demo existing 10% of old framing & drywall. New framing, insulation, drywall, sink, floor leveling, tile, painting, new outlets, switches pot lights, door, trim and baseboards etc.
Upstairs powder room 2
Demo all walls and ceiling, vanity and toilet removal, installing new drywall, tile, vanity, toilet, outlets switches, fixtures, baseboards and painting.
Hi
I am looking for a reliable and affordable renovation company to build our basement.
The house is app. 2800 sq ft. I would prefer to have two sections in the basement: one with two rooms and one single room; however, I am open to suggestions. A new door will be required on the main floor as well. The basement shall meet requirements of Mississauga City for obtaining permit.
Depending on the quality of work and cost of basement, extension of the driveway and some renovations in the kitchen and bathroom of the main floor might also be requested.
Thank you.
Need a complete basement reno. Ive done a little bit of the demolition, can finish that myself once the plans are confirmed.
Need new bedroom, 3 piece bathroom and laundry room, plumbing, electrical for new lighting, rec room.
Looking for someone who is available to start asap or in a week or two. The rest of the details can be discussed in person.
My basement is unfurnished, like to make two basement apartment with separate washroom & kitchen.
1st Basement Apt.
- 1 bedroom
- washroom (standing shower + sink)
- kitchen (full cabinets, exhaust, stove, fridge)
2nd Basement Studio Apt.
- washroom (standing shower + sink)
- kitchen (limited cabinets, exhaust, stove, fridge)
Flooring:
- I'm thinking of laminate but up for other options as well. Basement is not wet or moist but still like to make sure floor can handle moisture. Should be waterproof.
- 1600 Square Feet We Need Finished
- Roughed In For Fireplace and Washroom
We want our basement fully finished with...
- Laminate Flooring
- Fireplace
- Closet
- 1 Wall tear down
- 1 Crawl Space
Please provide accurate quote within a range and we will get in touch with those who provide some kind of figure.
Regards
I have a finished basement which has 2 bed rooms, large rec space, kitchen and bath.
Would like to keep 1BR to myself and have the remaining area converted as a registered 2nd dwelling unit.
There is no separate entrance and the basement windows are standard.
I am looking for a rough estimate for the project and someone who can handle everything from start to finish.
I am looking for a reliable and affordable person, someone who takes great pride in the smallest details and loves what they do.I need to replace a kitchen vanity, countertops, restain hard wood, replace carpet in basement and install new flooring. Along with some other minor repairs.
Kitchen Reno:
Kitchen size = L3.04 x W2.33
Breakfast Area = L2.89 x W2.33
Rectangular shape.
Would like to extend kitchen into breakfast area.
Cabinets, floors, countertops, Double sink, vegetable sprayer (mid-range quality), maybe an island if space permits.
Basement:
Unfinished basement
Approx. 550 sq. ft
Open living space, decent laminate flooring, possible bathroom
Looking to complete an unfinished Laundry Room. Located in a finished basement. Approximately 22 feet in length x 8 feet in height. Drywall and installation. Ceiling and flooring needs completion and lighting. Pot lights preferred. As far as the flooring we would light vinyl flooring. The home was built in 1985.
Project is to convert an existing finished basement area ( used as entertainment area) into a legal second unit with below grade side entrance.
Location :
Derry and McLaughlin - Mississauga.
Drawings ready ( refer the attached sheet) and building permit will be available in Dec 2nd week.
Total sq feet: 600
Room details:
Bedroom - 2
Living room
Kitchen
Bathroom - cold room converted to bathroom
Washer/ dryer provision
Flooring
Note: Basement is currently finished with the framing, drywall on the outer walls and has electrical and HVAC done. Currently used as an entertainment area.
Hello - i live in churchill mwadows - recently got my existing finished basement building permit approved. Now i am just looking for someone to give me a quote to finish it according to the plan so i can get it registerred. Please see the picture of the plan attached and if you can provide me with an approximate quote - that would be great.
Highly skilled basement subcontractor wanted. We are seeking a highly qualified basement subcontractor to join our team of professionals in Peel Region. We offer year-round work, competitive labour rates, an established sales force, and the opportunity to work with a knowledgeable staff. No selling on your part. Jobs are sold and ready for immediate install. If interested, please contact us with company name, point of contact, phone number and email so that we may schedule a meeting.
i want to make a door to make a separate entrance to basement. its a semi-detached corner plot. there is a brick wall and i want to make a door over there which will open to a stair case leading to the basement. there is a window on tht wall, which afterwards will be above the door. i want the work done as soon as possible by a professional contractor. please email me the cost and how much time this will take to be completed? thanks!
Attached are Bsmt drawings and Laundry room dwgs.
-urgent start
-bathroom, bed and living room in bsmt.
-No kitchen
-Laundry in Garage only
-bsmt waterproofing completed recently.
-fully unfinished bsmt
-4 new windows needed
-bsmt permits applied with city of mississauga
-no forced air heating, only electrical baseboard heating
-Laundry room and bsmt will require insulation
-No side entrance needed
-New washroom rouch-in required
-Sewage ejector needed for bsmt toilet
-New Laundry room / mudroom in garage
Please provide a detailed price and start date.
As part of a complete basement renovation, I would like to see if it is feasible to open the stairway from the main floor to the basement and replacing with railings to match stairway to 2nd floor. This will involve demo of existing walls, ensuring structural integrity of staircase, railing installation and finishing/painting etc.
I would like to see a quote with list of materials required and project plan.
2300 sq foot home with finished basement as a 2 bedroom apartment with kitchen and 3 piece bath with seperate ground floor enterence with tiled floors. Basement area is about 1100 sq feet. i am looking to reuse this space as a living area/play area. Relocating the bathroom and reducing the size of the two rooms to accomidate an office and small bedroom. Cover the existing tile and to lay down a more warmer floor perhaps carpet with thick underpadding in the main living area space. Work can start as soon as April 2010 and looking for 4 weeks or less for delivery.
- house is 3 1/2 years in a developed residential area, no work has been completed in basement as of yet.
- would like 3 pc bathroom with shower stall
- to get an idea of floor plan you can refer to the followingclick here on plan i would like washer and dryer moved next to HWT
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.