We are closing the purchase of our townhouse next week, and wanted to redo the 2 bathrooms on the upper level.
At a minimum, we want to replace the vanity set and the existing tub/column shower with a new vanity set and standing column shower in each bathroom. We may want to have the tiles redone (based on budget).
We are planning on buying the materials from costco or other similar locations. But, we are open to recommendations.
Master: 10' x 8'.
tear down and re-tile shower stall, floor, walls. Replace toilet and vanity, paint, install new fixtures and lighting, create door throough one of the bathroom walls to connect to other room. Install exhaust
Full bathroom on 1st floor: 10' x 5':
Please quote general update work. House is 16 years.
Powder room: 7.5' x 4.5':
Please quote general update work.
I am budget conscious. Do not want an spend too much. Just enough to get an updated look for selling it 4 years from now.
Hi,
I would like to get a quote for the repair of our bathroom.
The tiles open up and water leaked inside the tiles and possibly through the wall. I would like to have the tile and bathtub removed, changed the wet portion of the wall and put new tiles and bathtub.
I would like to get a quote/estimate for the aforementioned repair and have it done sooner than later.
Thanks in advance.
Regards,
erwin
Update of a bathroom by replacing vanity, toilet and laying tiles (currently doesn't have tiles). The bathroom is 10’3”x 4’11”
I will be providing vanity, tiles, faucets and countertop.
Please note that onsite appointments are not possible at this time as closing on the house is end of this month. I would appreciate if you can provide approximate quotes based on the pictures.
I need to have my Small bathroom in Condo. approx. 35 square feet updated. The job Needs to remove floor tiles, remove old toilet, vanity, mirror, light fixture. Install new floor tiles, fix minor drywall issues, paint walls, ceiling, install new toilet, vanity, mirror, light fixture. All fixtures, paint, tiles purchased my myself, for job.
Tiles around bathtub replaced.
Bathtub/shower hardware replaced.
Sink and stand to be replaced (one piece sink/counter top preferred).
Current tile floor may need to be replaced due to colour, although in excellent condition.
New Washing Machine & Dryer (stackable) will be purchased by Owner but we require all existing plumbing for Washing Machine checked/upgraded if applicable. Similarly the exhaust for the Dryer.
Paint bathroom.
Please provide the quote for vanity custom cabinet from the low end options to the higher end: Melamine - MDF - to OAK
Also provide a quote for the granite counter top per sq ft and cost of under-mount sinks (4) rectangular sinks
vanity 1: 6 feet by 2 feet (need drawers in the middle)
vanity 2: 3 feet by 2 feet
powder room: 3 feet by 22 inches (need drawers)
Job # 1 Bathroom Reno
Upstairs standard size bathroom ( approx 6x6 feet) , plus tub alcove
Have already purchased new vanity , tiolet , tub, and faucets. Need removal of old items (tiolet ,vanity and tub , and install new.
- Floor and tub area only need to be tiled (have the porclein tile and grout) .
*Note most old tiles in the bathroom have already been removed with exception on those under tiolet/sink. Tiles are easy to remove .
Job# 2 same as above but also include installation of new ceiling fan , light fixture over mirror and towel warmer (already purchased)
Job #3 Slate flooring installed on main level , approx 220 square feet. (Floor is currently covered in vinyl tiles ) . Install new sink and toilet in powder room (2.5 X 5 ft) on main level, over the slate flooring.
I live in a small 2 bedroom/1 bath condo on the fifth floor of a seven-story building that is about forty years old. All of our plumbing fixtures seem to be leaking and we want to straight-out replace most of them. We have a new two-tap faucet for the bathroom sink that the previous owner left us and would like to replace it and the vanity with countertop. The vanity with backsplash is 30" long by 23" deep by 32" high and there is an additional layer of tile backsplash above that, which we would like to retain, if possible. We have ideas what we would like for a new vanity, but have not yet acquired one.
The bathroom fan also needs to be replaced - the housing is there, but the fan itself has been disconnected and removed since we have been living here. Also, we have a persistent leak with the bathtub faucet, and though replacing the seals on the handles and building up caulk around the seals has helped, it would be nice if that could be looked at.
Finally, we would like to replace the kitchen faucet, a simple two-tap faucet, 10" x 2" over a double sink. We have not yet bought the new faucet.
We are looking for a ballpark estimate on the cost of these projects. I don't mind very rough if you can e-mail me at least a general range how much this would cost, as we have no idea what the labour on this would be like. If you need more information, please feel free to ask me and I will be happy to oblige. Thank you and have a nice day.
Remove and dispose three shower walls, damaged insulation behind walls, vapor barrier and existing faucet and bathtub. Want to install standard whitw tub, builder grade shower faucet with foot spout, cement board around shower walls, put 6x6 standard white wall tiles, install grout and silicone and 2 pieces of baseboard behind toilet and around front of bathtub.
Hello, we have just purchased a 4br detached home right in the heart of Mississauga and it will be closing on Sept.15.14. We would like to get estimates before the closing date and hopefully start the reno by the time we take possession of the house. 3 Full Bath and 1 powder room we would like to renovate. Please contact us and we are available weekdays after 5pm and anytime on the weekends.
Thanks.
Age of house is 14 years. Bought house brand new and never had any renovations on the washrooms.
Master's bathroom, overhaul renovation. Needs retiling in shower area and bathtub, replace to eco toilet & sink and change counter top to granite, repainting if necessary. Needs over the counter cabinets or shelving.
Main washroom, needs retiling on bathtub walls, change sink and countertop to granite. Currently have a small vanity top only for sink, wants to extend the vanity top over toilet for more table area.
Mainfloor toilet, needs to change toilet to eco toilet. Currently have sink without cabinet. Would lik to change sink with vanity cabinet.
I live on the top floor of a condo. The only bathroom is small and I would like to replace the tub and the tiles. The tub and tiles have been repainted by a refinishing firm and the results have been atrocious. Instead of contacting that firm, and I don't want them back in my place, I've decided to replace the monstrocities. The width of the bathroom is the same as the width of the tub. I would like some ideas and estimates, please.
bathtub faucet and tap require replacement, pipping inside wall will require removal of tile surround in order to replace. This may lead, depending on price and labour hours to a complete remodeling of tub area, and again, depending on price and estimated labour hours, potentially floor tile replacement and counter/sink/ cabinets replacement ("might as well do it all at once" attitude). this all began from the fact that I have had plumbers in at $160 to replace an outdated 5cent washer in my tub faucet as it will not stop running and I've been told that the whole thing really just needs replacing. This is a condo unit, so I need this done well (resale value) as well as quickly (only one bathroom and I have a 2 year old which makes it hard to stay anywhere else during renovation. All quotes welcome, but I would need this taken care of soon, quickly and at reasonable rates. The job may consist only of tap/faucet and tile tub surround replacement, or if well quoted and you are a quick, reliable, reputable, and trustworthy tradesman/ contractor, could turn into a complete bathroom overhaul.
Our house is a traditional side-split from the 1960's, has an old jacuzzi tub in the upper washroom. We want it swapped out for a standard bathtub. We've already purchased the new bathtub, it's the same size and is skirted on the exposed side, so we don't need the lower tiling to be re-done.
Please seeclick here for a YouTube video of the situation.
Our house is a traditional side-split from the 1960's, has an old jacuzzi tub in the upper washroom. We want it swapped out for a standard bathtub. We're already purchased the new bathtub, it's the same size and is skirted on the exposed side, so we don't need the lower tiling to be re-done.
We have a big bedroom upstairs that we want to convert into a second master bedroom. Currently, it is only a big room with no bathroom or closets. Want to start by building out a bathroom in the bedroom and maybe a closet later on.
Want the bathroom to contain the following
- Sink
- Toilet
- Bathtub if possible (space permitting) or standing shower.
Looking for online estimates at this time only.
The project will involve suppling material as needed to cut into the laundry room floor to create an opening for the new staircase. Stairs to be painted or carpeted, so no need for high grade stairs. I currently have a shower stall which needs to be removed, and an air vent that is in the area of the new stairs; Cap plumbing and reroute ductwork as needed within the laundry area. basement has a concrete floor; floor to floor hight is approx 102"but there is a step down in laundry room area that if possible i'd like to utilize approx 5.75", reducing hight to 96.25"approx.
Kitchen Renovation
Bathroom renovation
New bathroom and laundry room installation ( plumbing and Electrical installation)
Basement suite- basement currently finished but needs a revamp, Egress window, installation of dry wall ceiling, bedroom partition and installation of closet. basement bathroom update as well as an installation of shower, inclusive of plumbing.
Update some electrical outlets to facilitate 220v, as well as provide electrical ground outlets, some outlets in the house are already grounded.
We are a manufacturing facility in Mississauga. Looking to have existing men's changeroom and washroom area gutted and rebuilt. Presently washroom consists of one stall, one urinal, one Bradley sink, and a laundry tub. We want to go to 2 stalls with heavy duty commercial toilets, two urinals, a Bradley or similar style sink and a cleaners mop/bucket drain area. New flooring and wall cover (easy clean) and paint. We also have a plumbing job requiring installation of flow meter in a drain.
Post your project and let top-rated pros compete to get your business. Compare bids, read real customer reviews and hire the best contractor the first time.